No. No wells will be drilled. Not a single gallon of groundwater will be pumped. Residents' private wells and any municipal wells nearby are completely untouched.
Like the coolant in your car: liquid loops through sealed pipes, absorbs heat, and releases it to the air. The system is closed — nothing touches the groundwater supply.
No. Water will be supplied through existing infrastructure and will remain within the allocated daily capacity.
If any infrastructure improvements become necessary, Bitdeer funds them in full — including any new storage tanks. Once built, the upgraded infrastructure is handed to Portage County to own permanently, at no cost to residents.
No. No chemicals or industrial liquids are stored on site. Stormwater drains through standard commercial systems — the same as any office park.